DN350 Steelmaking Workshop Metal Hose
The official website of Shanghai Songjiang Vibration Absorber Group Co., Ltd. introduces information about DN350 Steelmaking Workshop Metal Hose. Songjiang Group provides stainless steel metal hose products for numerous iron and steel smelting enterprises. This product offers excellent shock absorption effects, effectively protecting the long-term service life of pump equipment.
Material Description: Corrugated Tube, Braided Mesh: For a longer service life, all are produced with stainless steel 304 raw materials, supporting various spectrometer tests. We offer a tenfold compensation for any falsification, and the thickness exceeds industry standards.
Flange Connections: All flanges are made from authentic forged materials from Shanxi, providing excellent strength and sealing properties. Please do not compare them with common cast steel or plate steel flanges on the market, as they are incomparable.
Welding Material: Welding materials exceed the grade standards of the base material, ensuring a more robust weld.
Introduction to Steelmaking:
Steelmaking is the process of controlling carbon content (generally less than 2%), eliminating harmful elements such as P, S, O, N, retaining or increasing beneficial elements like Si, Mn, Ni, Cr, and adjusting the proportions between elements to achieve optimal performance.
To make steel, pig iron is placed in a steelmaking furnace and melted according to a certain process, resulting in steel. Steel products include steel ingots, continuous casting billets, and various steel castings produced directly. Typically, when referring to steel, it generally means steel that has been rolled into various steel products. While steel is classified as a ferrous metal, it is not entirely synonymous with ferrous metals.
Continuous casting involves pouring molten steel from a ladle into a tundish, and then into a mold. The steel liquid is pulled out of the crystallizer by a continuous casting machine at a certain speed after rapid cooling. After secondary cooling and forced cooling, the fully cooled steel is cut into billets of a certain size and then sent to the rolling mill.
Related Link:“Shanxi Datong Puyun Project” Metal Hose Contract