Xingyang Longcheng Experimental School Project Rubber Expansion Joint Contract
Shanghai Songjiang Vibration Absorber Co.,Ltd. Official Website Introduction:Xingyang Longcheng Experimental School Project Rubber Expansion Joint Contract Information Songjiang Group provides shock absorbers for numerous schools. Below is the information regarding the rubber expansion joints supplied for the water pumps at Xingyang Longcheng Experimental School.
1. Xingyang Longcheng Experimental School Project Introduction:
The Longcheng Experimental School Project is located in Xingyang, a historic site of the “Chu-Han Contention” era. The total construction area of the project is approximately 190,000 square meters. This includes about 60,000 square meters for the school, which uses a frame structure, and about 130,000 square meters for the Haokun Garden residential project, which uses a high-rise shear wall structure. The project commenced in July 2018 with a total construction period of 3 years.
2. [Xingyang Longcheng Experimental School Project] Rubber Expansion Joint Contract Introduction:
The following is a scanned copy of the contract. This document is provided solely as proof of supply and is not for any other purposes. Please do not reproduce or modify this document.
3. [Xingyang Longcheng Experimental School Project] Rubber Expansion Joint Product Photos:
Related Link:【EPDM】DN65 Chemical Pipeline Rubber Expansion Joint