The Rubber Joint Contract for Hangzhou Binjiang District Gymnasium
The official website of Shanghai Songjiang introduces the rubber joint contract information for Hangzhou Binjiang District Gymnasium. Songjiang Group provides high-quality rubber joint products for numerous gymnasiums, Olympic sports centers, Winter Olympic venues, National Games, and other projects, serving the purpose of shock absorption and noise reduction. The following is a detailed introduction.
2. Introduction to Hangzhou Binjiang District Gymnasium Project:
Hangzhou Olympic Sports Center is planned with a layout structure of ‘Green Core, Extended Axis, Water and Green Integration, and Five Surrounding Areas.’ The Green Core: The central area combines the Seven Jia River surface and open undulating green landscaping to form a natural core landscape. Extended Axis: Consideration is given to the landscape effect and axis relationship that echoes with the core area of Qianjiang New Town on the north bank of the Qiantang River. Water and Green Integration: Emphasis is placed on ecological, green, and park-like features. By utilizing the Seven Jia River, a waterfront Olympic Sports Center is constructed to create a ‘Sports Harbor’ with distinctive features of Hangzhou. The stadium (Hangzhou Olympic Sports Center Stadium), also known as the ‘Big Lotus Flower,’ covers an area of 430 acres, with a total construction area of 229,000 square meters and approximately 80,800 seats. It consists of six above-ground floors and one underground floor. The ‘Big Lotus Flower’ is composed of 28 large petals and 27 small petals, forming a unique unit. The blank spaces between the ‘petals’ resemble traditional Chinese architectural landscape windows. The interaction between internal space and external landscape is achieved through innovative ‘floor-to-ceiling windows,’ while borrowed scenery endows the ‘Big Lotus Flower’ with a classical and romantic atmosphere beneath the steel framework. The petals are arranged in an interlocking pattern, each petal not being solid but structured like a translucent ‘cicada wing.’ The entire steel canopy of the stadium’s outer edge is approximately 333 meters long from north to south and about 285 meters long from east to west. After multiple rounds of optimization and improvement, the total steel used in the structure is only 28,000 tons, reducing 14,000 tons compared to the ‘Bird’s Nest’ in Beijing. As the main venue for the 2022 Hangzhou Asian Games, the opening and closing ceremonies will be held here.
The gymnasium (Hangzhou Olympic Sports Center Gymnasium) has a total construction area of 74,470 square meters and approximately 18,000 seats (15,000 fixed seats and 3,000 movable seats on retractable platforms). It is suitable for basketball, badminton, volleyball, table tennis, handball, artistic gymnastics, boxing, martial arts, indoor soccer, and other competitions. It serves as the basketball venue for the 2022 Hangzhou Asian Games. The gymnasium features a convertible ice basketball court, built to international event standards using advanced technology. The ice surface dimensions are 30m * 60m, totaling 1,800 square meters. The venue has a refrigeration system with ethylene glycol as the refrigerant for the ice surface. After ice formation, the venue can be rapidly converted to different configurations within 6 to 8 hours based on the requirements of various events. It is capable of hosting events such as NHL, KHL, curling, figure skating, short track speed skating, and more.
2. Introduction to the Rubber Joint Contract for Hangzhou Binjiang District Gymnasium:
3. Introduction to Rubber Joints for Hangzhou Binjiang District Gymnasium:
Related Link:【2.5Mpa】DN125 high-rise circulating pump rubber expansion joint