Rubber Expansion Joint Contract for Tongzilin Hydropower Station in Yanbian County, Panzhihua

Rubber Expansion Joint Contract for Tongzilin Hydropower Station in Yanbian County, Panzhihua

service content:Rubber Expansion Joint Contract for Tongzilin Hydropower Station in Yanbian County, Panzhihua

brief introduction:Rubber Expansion Joint Contract for Tongzilin Hydropower Station in Yanbian County, Panzhihua Shanghai Songjiang Shock Absorber Group Co., Ltd. official website presents: Rub...

Rubber Expansion Joint Contract for Tongzilin Hydropower Station in Yanbian County, Panzhihua

Shanghai Songjiang Shock Absorber Group Co., Ltd. official website presents: Rubber Expansion Joint Contract for Tongzilin Hydropower Station in Yanbian County, Panzhihua, at the Ertan Hydropower Station, Yibin County, Yanbian County. Songjiang Group provides high-quality rubber expansion joints for numerous hydropower station projects, with a 3-year warranty.

Rubber Expansion Joint Contract for Tongzilin Hydropower Station in Yanbian County, Panzhihua

1.Introduction to Tongzilin Hydropower Station at Erta Hydropower Station in Yanbian County, Panzhihua:

Tongzilin Hydropower Station is located in Yanbian County, Panzhihua City, Sichuan Province, 18 kilometers downstream of the Erta Hydropower Station, and 15 kilometers from the confluence of Yalong River and Jinsha River. It is the last cascade power station in the Yalong River hydropower base and a landmark project of the national Western Development Strategy.

The installed capacity of Tongzilin Hydropower Station is 600,000 kilowatts. With the upstream Jinpin primary and the Ertan Reservoir combined operation, the designed average output during the dry season is 227,000 kilowatts, and the average annual power generation is 2.975 billion kilowatt-hours. The total investment of the power station is 6.244 billion yuan, and the total construction period is 72 months.
Tongzilin Hydropower Station is primarily responsible for power generation tasks and also meets downstream comprehensive water use requirements.

On November 8, 2014, at 19:28, with the last large piece of rock poured into the outlet, the diversion canal of the third phase of Tongzilin Hydropower Station in Panzhihua, Sichuan Province, was successfully closed.

Tongzilin Hydropower Station is located in the main stream of the Yalong River in Yanbian County, Panzhihua City, Sichuan Province,
18 kilometers from the upstream Ertan Hydropower Station, and 15 kilometers from the confluence of the Yalong River and Jinsha River downstream. It is the last cascade power station on the downstream of the Yalong River. The primary task of Tongzilin Hydropower Station is power generation, and it also meets downstream comprehensive water use requirements. The Yalong River mainstream from Gaya Temple to the river mouth plans to develop 21 levels. The natural drop is 2,845 meters, the installed capacity is 28.56 million kW, and the annual power generation is 151.636 billion kWh.

The Yalong River Hydropower Base is one of the 13 planned hydropower bases in the country. The resources of the 13 major hydropower bases account for more than half of the national total, and the construction of the base occupies an important position in hydropower construction. It is a landmark project for Western Development. The proposal of the 13 major hydropower bases has played a significant role in promoting the cascade development of hydropower basins, optimizing resource allocation, and driving economic development in the western region.

Tongzilin Hydropower Station was approved by the National Development and Reform Commission on September 25, 2010, with the first unit planned to be put into operation in March 2015 and the project completed in March 2016, with a total construction period of 81 months. The total static investment of the project is 5.191 billion yuan, and the total dynamic investment is 6.257 billion yuan. The power station has 4 units of 150,000 kilowatts each, with a total capacity of 600,000 kilowatts. With the upstream Jinpin primary and the Ertan Reservoir combined operation, the designed average output during the dry season is 227,000 kilowatts, and the average annual power generation is 2.975 billion kilowatt-hours.

Tongzilin Hydropower Station is primarily responsible for power generation tasks and also meets downstream comprehensive water use requirements. The maximum dam height of Tongzilin Hydropower Station reservoir is 66.63 meters, the dam top length is 468.7 meters, the normal water level is 1015 meters, and the total storage capacity is 91.2 million cubic meters. The reservoir has daily regulation capabilities. Four sets of 150,000-kilowatt axial-flow turbine generators are installed, with a total installed capacity of 600,000 kilowatts. With the upstream Jinpin primary and the Ertan Reservoir combined operation, the designed average output during the dry season is 227,000 kilowatts, and the average annual power generation is 2.975 billion kilowatt-hours. The total investment of the power station is 6.244 billion yuan, and the total construction period is 72 months.

2. Introduction to the Rubber Expansion Joint Contract for Tongzilin Hydropower Station at Erta Hydropower Station in Yanbian County, Panzhihua:

Rubber Expansion Joint Contract for Tongzilin Hydropower Station in Yanbian County, Panzhihua

3.Rubber Expansion Joint Introduction for Tongzilin Hydropower Station at Erta Hydropower Station in Yanbian County, Panzhihua:

Rubber Expansion Joint Contract for Tongzilin Hydropower Station in Yanbian County, Panzhihua

Rubber Expansion Joint Contract for Tongzilin Hydropower Station in Yanbian County, Panzhihua

Related Link:KXT-SUS Type Stainless Steel Flange Rubber Expansion Joint