Contract for Spring Vibration Absorbers for Guiyang Metro Line 2 Project
Shanghai Songjiang Vibration Absorber Co.,Ltd.Official Website presents: Contract Information for Spring Vibration Absorbers for Guiyang Metro Line 2 Project. Songjiang Group provides spring shock absorber products for numerous urban metro projects in China. The following is an introduction to the spring shock absorbers provided for the Guiyang Metro Line 2 project.
1.The project information of Guiyang Metro Line 2:
The Guiyang Metro Line 2 is a subway line under construction in Guiyang, Guizhou Province, China. The line starts from Qiji Road Intersection Station, passing through stations such as Baiyun District Administrative Center, Lincheng West Road, Changling Road, Beijing West Road, Erqiao, Penshuichi, Provincial Hospital, Youzhai Street, Forest Park, Longdongbao International Airport, and Xiaobi, and finally terminates at Keyun East Station. The total length of Line 2 is 43.8 kilometers, with 32 stations and an average station spacing of 1.34 kilometers. It is divided into Phase I (Qiji Road Intersection to Youzhai Street) and Phase II (Guigang to Shuiyanba), with station names subject to change upon opening. The total investment is 17.73 billion yuan, and it is planned to be fully operational by 2020.
The first phase of Line 2 is 41.5 kilometers long, with 32 stations and an average station spacing of 1.34 kilometers, constructed in two phases. The first phase, with a total length of 27.1 kilometers and a total investment of 19.459 billion yuan, is scheduled to be completed and opened to traffic by 2020. The scope of the first phase extends from Qiji Road Intersection Station to Youzhai Street Station, covering a distance of 27.1 kilometers with 24 underground stations and one vehicle base. The second phase extends from Youzhai Street Station to Shuiyanba Station, covering a distance of 11.9 kilometers with 8 stations and one parking lot, planned to be completed by 2020.
The first phase of Line 2 starts from Qiji Road Intersection Station in Baiyun District and ends at Youzhai Street Station. The average station spacing is 1196 meters, with a maximum spacing of 2168 meters and a minimum spacing of 632 meters. Currently, the line has two interchange stations with the operational Metro Line 1, including Lincheng West Road Station and Penshuichi Station. The overall design maximum passenger flow of Line 2 in the long term is 31,000 passengers per hour, with the near-term expected maximum passenger flow of about 23,000 passengers per hour at Jinzhu West Road Station, the station with the largest designed area. It is planned to be completed by February 29, 2020.
2.Scanned copy of the contract for spring shock absorbers for Guiyang Metro Line 2 project:
3.Shipping image of the contract for spring shock absorbers for Guiyang Metro Line 2 project:
4.Shanghai Songjiang Vibration Absorber Co.,Ltd. Introduction: